A supplier evaluation usually comes down to one question: can you make this repeatably? The answer is a process list and a batch record, not an adjective.
| Stage | What it covers |
|---|---|
| Coil winding | Programmable winders with tension control; bobbin and self-supporting types. |
| Assembly | Frame, plunger, spring and bearing assembly on dedicated fixtures. |
| Encapsulation | Potting or over-moulding where the application needs sealing or damping. |
| Termination | Fly leads, PCB pins, connectors or terminal blocks, strain-relieved. |
| Test | 100% electrical screening; sampled mechanical and thermal testing per lot. |
A solenoid is a small part with a short tolerance chain. The coil resistance, the air gap and the plunger fit all interact: a 0.05 mm change in the gap moves the force curve measurably. When winding, assembly and test sit in different buildings, that interaction is invisible — each supplier meets its own drawing and the assembled part still misses the specification.
Keeping the processes together means a drift in force shows up in the same week it starts, and the cause can be traced to a specific station rather than debated between suppliers.
Send it over. An engineer reviews every enquiry and replies with a feasible concept, not a brochure.